Text Box: This repaired the nave (the main body) of the Church. Water was leaking in and the roof needed urgent repair
Text Box: Once the tower is safe and waterproof the pathways of the well visited  graveyard need upgrading
Text Box: spare

Built in 1533 there has been no access for some time. The roof leaks, the parapet needs the Victorian repairs re-doing.  The bells are still rung by our team of ringers

Phase 1  - the Nave

Project name 4

Phase 3— Grounds

Phase 2—The Tower

Restoration